Española versión Version française deutsche Version
HOME USER GUIDE IMGR Distribution
IMGR Distribution
Presentation of FOURMI®
Examples of movements
Accessories
User guide
Clients
Downloads
Contact
  • 1 case of 12 FOURMI® will move a 5 bay (double sided) gondola
• 2 cases of 12 FOURMI® will move a 11 bay (double sided) gondola
• 3 cases of 12 FOURMI® will move a 17 bay (double sided) gondola
     
Stage 1
Using the e specially designed FOURMI® Lever bar :
     
Stage 2
Position the FOURMI® Lever's heel end .
 
     
Stage 3

Insert the shelving unit's outer foot into the engineered notch of the FOURMI® Lever.

 
     
Stage 4
Simply lift the unit's foot by just 3cm (1.18 inches).
 
     
Stage 5
Slide the FOURMI® skate under it by positioning the foot carefully into the circular slot engineered into FOURMI®.
 
     
Stage 6
Release the foot down. FOURMI® is fitted.
 

Repeat this procedure until all the unit's outer foot are fitted with FOURMI®.
If the unit is loaded with unstable merchandise (such as liquids) you are advised to remove 30% of the stock.

Once all your FOURMI® are fitted, one person situated at the unit end and two or three others to guide the manoeuvre are needed to move the shelving to the designed area.
When the shelving is in the required place, lift its feet with the FOURMI® Lever bar to remove all the FOURMI® skates.
   
  Copyright © 2007 IMGR Distribution. Tous droits réservés. - Credits : G2MS
 
HOME HOME